Home
|
Press
|
Events
|
Eshare
Sign in
/
Register
0
Shopping Cart
X
Close
My Products (0 items)
My shopping cart is empty.
.
Sign in
/
Register
X
Close
Login/Register
Email
Password
INDUSTRIES
Agriculture
Chemicals
Food & Feed
Pesticides
Titanium Dioxide (TiO2)
Dairy Products
Full Industry List
ONLINE DATABASE
PRICE FORECAST
PRODUCTS & SERVICE
Products' Introduction
Industrial Reports
Newsletters
Market Data
Content Byte
Agrochemical Regulatory
Customized solutions
IMPACT FACTOR
MARKET NEWS
Agriculture
Chemicals
Food & Feed
Other
ABOUT
About CCM
Why CCM?
CCM Story
CCM Clients
Events
Career
Company news
CONTACT
Home
Product
Complimentary download
PetroChina Jiangsu LNG project becomes trial operational
Recommend Report
Need some help to find your information ?
E-mail:
econtact@cnchemicals.com
Tel: +86-20-37616606
Search Report
Agriculture
Biotechnology
Chemicals
Economics and investment and financial
Energy and utilities
Food and Feed
Food and Feed (Ingredients)
Minerals/resources/mining
Pesticides
Pharmaceuticals and healthcare
Printing & packaging
More Reports >>
Recommend Newsletter
Related market data
Related product
Related research
PetroChina Jiangsu LNG project becomes trial operational
Keyword:
Publish time:
25
th
May, 2011
Source:
CNPC
Information collection and data processing: CCM For more information, please
contact us
On May 24, the first cargo of some 145,000 cubic meters LNG was delivered to Jiangsu LNG receiving terminal, marking the trial operation of this project.
The cargo was delivered by the Q-Flex LNG carrier "Al Rekayyat" from Qatar, which is the world's second largest one and the largest LNG carrier that ever been received in China. With a total length of 315 meters and a width of 50 meters, the ship has a full capacity of 216,000 cubic meters.
Located in Rudong county of Jiangsu Province, the LNG project is composed of artificial islands, receiving terminals, pierhead trestles and sea-crossing pipelines, mainly receiving, storing, gasifying and transporting oversea LNG. The project has a maximum unshipping capacity of 267,000 cubic meters.
At present, the phase 1 project has been completed with the annual receiving capacity of 3.5 million tons and the gas deliverability of 4.8 billion cubic meters. Meanwhile, it can provide ten days peak shaving gas accommodation for the West-East Gas Pipeline. The phase 2 project is planned to become commissioning at the end of 2013, which will boost the annual receiving capacity to 6.5 million tons and the gas deliverability to 8.7 billion cubic meters. The project will have a long run capacity of 10 million tons and 13.5 billion cubic meters respectively.
Located in Rudong county of Jiangsu Province, the LNG project is composed of artificial islands, receiving terminals, pierhead trestles and sea-crossing pipelines, mainly receiving, storing, gasifying and transporting oversea LNG. The project has a maximum unshipping capacity of 267,000 cubic meters.
Index Type:(required)
-- Please select --
Message:(required)
Name:(required)
Email:(required)
Tel:
Message:(required)
Name:(required)
Email:(required)
Tel: